Vanderbilt University- MRB III Pedestrian Bridge Repair
Location: Nashville, TN
Client: Vanderbilt University
Duration: 6 months
Engineer: THP Engineering
Description of Work
Remove topping slab down to structural slab, installed new split-slab waterproofing system, place new topping slab, and paint structural steel.